DAO governance attacks: how flash loans and vote manipulation drain treasuries

DAO governance attacks: how flash loans and vote manipulation drain treasuries

21 min
On this page▾
In this article: How governance attacks weaponize legitimate protocol mechanics — flash loan atomicity, EVM opcode injection, quorum exhaustion — and the defensive architectures (timelocks, N-1 checkpointing, optimistic dual governance) required to secure DAO treasuries.

The advent of Decentralized Autonomous Organizations (DAOs) has systematically restructured digital capital coordination, replacing traditional corporate hierarchies with smart contract-based governance models operating on distributed ledgers. In these environments, decision-making is executed through token-weighted voting systems. However, the operational reality of decentralized governance frequently diverges from its theoretical design. The predominant "one token, one vote" model introduces systemic vulnerabilities stemming from what mechanism design literature defines as the "indistinguishability problem." Permissionless blockchain networks lack the native capacity to differentiate between long-term, aligned stakeholders and malicious actors acquiring temporary voting power to extract immediate financial value.
Unlike traditional cyberattacks that exploit cryptographic flaws or memory leaks, governance attacks weaponize the legitimate, deterministic mechanics of the protocol. As Decentralized Finance (DeFi) protocols accumulate significant Total Value Locked (TVL), their treasuries become highly lucrative targets for economic extraction. This article provides a rigorous forensic examination of governance attack vectors — including flash loan atomicity, EVM opcode injection, and quorum exhaustion — and evaluates the defensive architectures required to secure protocol governance.

Flash loan atomicity and EIP-3156 manipulation

To understand the modern landscape of governance exploits, auditors must first analyze the primary financial primitive utilized in these attacks: the flash loan. Flash loans allow users to borrow uncollateralized liquidity — often hundreds of millions of dollars — under the strict condition that the principal and a nominal fee are returned within the exact same transaction block.
The critical vulnerability lies in transactional atomicity. Within the Ethereum Virtual Machine (EVM) state machine, a transaction is indivisible. If the borrower fails to repay the loan by the end of the block's execution sequence, the smart contract automatically triggers a revert opcode, rolling back the global blockchain state to its pre-transaction condition. Consequently, lenders face zero counterparty risk.
The standardization of this mechanism via Ethereum Improvement Proposal 3156 (EIP-3156) established universal interfaces, requiring provider contracts to implement maxFlashLoan, flashFee, and flashLoan. Concurrently, the borrower's contract must implement a strict callback function, onFlashLoan, which must return the cryptographic hash keccak256("ERC3156FlashBorrower.onFlashLoan") to validate the execution.
1// EIP-3156 flash loan lifecycle
2interface IERC3156FlashBorrower {
3 function onFlashLoan(
4 address initiator,
5 address token,
6 uint256 amount,
7 uint256 fee,
8 bytes calldata data
9 ) external returns (bytes32);
10 // Must return keccak256("ERC3156FlashBorrower.onFlashLoan")
11}
12
13interface IERC3156FlashLender {
14 function maxFlashLoan(address token) external view returns (uint256);
15 function flashFee(address token, uint256 amount) external view returns (uint256);
16 function flashLoan(
17 IERC3156FlashBorrower receiver,
18 address token,
19 uint256 amount,
20 bytes calldata data
21 ) external returns (bool);
22}
When applied to naive token-weighted governance systems lacking timelocks, atomic execution creates a structural flaw. An attacker can program an algorithmic transaction to borrow millions in governance tokens, instantly approve a malicious proposal to drain the DAO treasury, and repay the loan within the same block — requiring zero initial capital to execute a hostile takeover.
This is the same atomic execution model that enables oracle manipulation attacks, but applied to governance rather than price feeds. For a deeper analysis of flash loan mechanics and AMM interactions, see our guide on AMM security foundations.
Flash loan governance attack flow

Forensic anatomy of governance exploits

Theoretical vulnerabilities, when combined with flash loans and EVM complexities, have repeatedly materialized into severe economic losses. Forensic analysis of these exploits reveals precise intersections between deficient mechanism design and high composability.

Atomic hostile takeovers: Beanstalk Farms

The April 2022 exploit of Beanstalk Farms, resulting in a $182 million loss within 13 seconds, serves as the definitive case study of a flash loan-assisted governance attack. The protocol featured an emergency execution route that required a two-thirds supermajority to bypass standard timelocks — an architectural decision intended to allow rapid responses to security bugs.
The attacker deposited a marginal amount of legitimate tokens to submit "BIP-18", a malicious executable proposal designed to transfer the protocol's locked assets to their personal address. After waiting the mandatory 24-hour proposal incubation period, the attacker initiated a dense atomic transaction:
  1. Borrowed $1 billion in stablecoins (DAI, USDC, USDT) via an Aave flash loan.
  2. Routed the capital through Curve Finance's 3pool to acquire 3Crv liquidity tokens.
  3. Injected 3Crv into the BEAN3CRV-f pool, depositing the resulting tokens directly into Beanstalk.
  4. Triggered the internal LibSilo.incrementBipRoots function, instantly recalculating vote weight and granting the attacker >78% of the total governance power.
  5. Invoked emergencyCommit() in the same execution frame, bypassing community voting to execute BIP-18.
The attacker drained the treasury, repaid the Aave flash loan, and routed roughly $76 million in profit through the Tornado Cash mixer. The entire exploit executed within a single block.
Exploit metricValue
Capital borrowed$1 billion
Governance power acquired78%+
Protocol loss$182 million
Attacker profit~$76 million
Execution time13 seconds (1 block)
Attacker's initial capitalMarginal (proposal deposit only)
This pattern mirrors the flash loan attack mechanics seen in oracle manipulation, but instead of distorting price feeds, the capital distorts governance weight. For a broader perspective on DeFi exploit patterns, see our 2025 exploit analysis.

EVM opcode injection and bytecode deception: Tornado Cash and Build Finance

While Beanstalk demonstrated flash loan vulnerabilities, the May 2023 Tornado Cash DAO compromise highlighted social engineering combined with executable bytecode injection. The attacker submitted "Proposal 20", superficially presenting it as a benign functional continuation of a previous proposal.
The exploit relied on EVM opcode manipulation. The proposal included an obfuscated function named emergencyStop(), which contained the EVM opcode selfdestruct(payable(0)). selfdestruct operates at the virtual machine level, entirely erasing the smart contract's bytecode from the specified Ethereum address.
1// Simplified exploit sequence
2
3// Step 1: Attacker deploys "benign" contract at deterministic address
4contract Decoy {
5 function emergencyStop() external {
6 selfdestruct(payable(0));
7 // Erases all bytecode at this address
8 }
9}
10
11// Step 2: Community votes to approve the contract address
12// Step 3: Attacker triggers selfdestruct, erasing the contract
13
14// Step 4: Using CREATE2 deterministic deployment,
15// attacker deploys HOSTILE contract at the SAME address
16contract Hostile {
17 function execute() external {
18 // Mints 1.2M fake governance votes to attacker
19 token.mint(attacker, 1_200_000e18);
20 }
21}
22
23// Step 5: When timelock executes delegatecall to the "approved" address,
24// it now runs the hostile payload
Once the community voted to approve the seemingly benign contract address, the attacker triggered the selfdestruct command. Utilizing deterministic contract creation via the CREATE2 opcode, the attacker deployed a new, hostile contract to the exact same memory address. When the timelock expired and the DAO executed via delegatecall, it executed the mutated payload. The contract minted 1.2 million fake votes to the attacker, obliterating the legitimate community's ~70,000 votes and enabling total protocol capture.
A similar lack of supply-minting constraints allowed an attacker in the Build Finance DAO to pass a malicious proposal that minted 1 billion unbacked $xBUILD tokens, diluting original holders and siphoning $470,000.
For more on how delegatecall creates attack surfaces in upgradeable proxy contracts, see our proxy security guide.
EVM opcode injection attack

Quorum exhaustion and oracle manipulation: Compound and Mango Markets

Attacks do not always rely on atomic execution. The July 2024 Compound Finance incident demonstrated "tunneling," where an entity known as "Humpy" systematically acquired and delegated COMP tokens across multiple addresses to reach critical electoral mass. Bypassing quorum defenses, they forced the execution of Proposal 289, diverting $24 million from the treasury to an external multi-sig under the guise of yield generation.
In Mango Markets, the attacker heavily over-leveraged a directional position on the illiquid MNGO governance token. By artificially inflating the collateral value via oracle manipulation, the attacker generated massive artificial liquidity credit to drain the exchange. Furthermore, MakerDAO faced an exploit where the "B Protocol" team used a 50,000 ETH flash loan to borrow 13,000 MKR, instantly voting to whitelist their own price oracles — highlighting the danger of exposing core systemic parameters to atomic capital.
ProtocolYearAttack vectorLossKey failure
Beanstalk2022Flash loan governance$182MEmergency execution bypass
Tornado Cash2023CREATE2 + selfdestructTotal captureNo bytecode verification post-vote
Build Finance2022Token minting proposal$470KNo supply cap on governance minting
Compound2024Quorum tunneling$24MInsufficient quorum threshold
Mango Markets2022Oracle + governance$115MLow-liquidity governance token
MakerDAO2020Flash loan votingPreventedOracle parameter exposed to vote
These incidents directly underscore why defense in depth is not optional — single-layer governance defenses consistently fail against economically motivated attackers.

Game theory, Sybil vulnerabilities, and the financialization of voting

To neutralize flash loan attacks, protocols introduced time-locked models like the Vote-Escrowed Token (veToken), pioneered by Curve Finance. By forcing users to lock underlying assets for up to four years, the architecture applies a logarithmic decay function to vote weight — alienating atomic capital from governance power.
However, the illiquidity of veTokens spawned a secondary market for voting influence (e.g., Votium, Hidden Hand). These platforms algorithmically optimize bribe allocation, routing yields to passive voters for an administrative fee. Analytical data from the Convex ecosystem demonstrated a 0.99 empirical correlation between direct bribe payments and liquidity gauge approvals, proving that governance can devolve into pure financial transactionism. This phenomenon is explored further in our deep dive on AMM security and DEX economics.
To combat plutocratic cartels, designers implement Quadratic Voting (QV), where the financial cost of voting scales geometrically:
Cost=Votes2Cost = Votes^2
While effective against whales, permissionless networks leave QV vulnerable to Sybil attacks. An attacker can split capital across 100 pseudonymous addresses, bypassing the quadratic penalty and reverting the system to linear dynamics.
1Standard voting: 100 tokens → 100 votes (cost: 100)
2Quadratic voting: 100 tokens → 10 votes (cost: 100)
3
4Sybil attack on QV:
5 Split 100 tokens across 100 addresses
6 Each address: 1 token → 1 vote (cost: 1)
7 Total: 100 votes for cost of 100
8 → Quadratic penalty fully bypassed
Mitigating Sybil vectors requires biological verification models, known as Proof of Personhood (PoP). Platforms like Gitcoin utilize Gitcoin Passport to aggregate Web2/Web3 credentials, applying weighted multipliers based on verifiable human identity. Additionally, off-chain defense mechanisms employ Graph Convolutional Neural Networks (GCNN) and Facebook AI Similarity Search (FAISS) to process multidimensional metadata from platforms like Snapshot.org, successfully identifying and neutralizing orchestrated Sybil clusters.
For a broader perspective on how MEV extraction interacts with governance vote manipulation, see our MEV defense guide.

Technical defense architectures and preventive modeling

Securing DAOs necessitates moving away from legacy smart contracts (e.g., the deprecated GovernorAlpha) toward multi-layered, OpenZeppelin-standardized architectures. The same pre-audit preparation principles that apply to DeFi protocols are critical for governance contracts.

Timelocks and temporal separation

The primary defense against flash loans is temporal separation via GovernorTimelockControl. By enforcing a non-negotiable execution delay between proposal approval and autonomous on-chain execution, malicious logic is trapped. Because a flash loan strictly requires atomic repayment within a single block, the attacker cannot bridge the temporal gap required to execute the payload.
1// OpenZeppelin GovernorTimelockControl pattern
2contract SecureGovernor is Governor, GovernorTimelockControl {
3 function _execute(
4 uint256 proposalId,
5 address[] memory targets,
6 uint256[] memory values,
7 bytes[] memory calldatas,
8 bytes32 descriptionHash
9 ) internal override(Governor, GovernorTimelockControl) {
10 // Execution is routed through TimelockController
11 // Enforcing mandatory delay (e.g., 48 hours)
12 super._execute(proposalId, targets, values, calldatas, descriptionHash);
13 }
14}

Block-level checkpointing (N-1 indexing)

Contracts utilizing GovernorVotes and ERC20Votes inherently reject real-time balance queries during vote transactions. Instead, they enforce a retrospective block census. If a vote occurs at block NN, the quantifiable voting weight is strictly indexed to the exact inventory snapshot recorded at block N−1N-1.
1// ERC20Votes checkpoint mechanism
2function getVotes(address account, uint256 blockNumber)
3 public view returns (uint256)
4{
5 // Returns vote weight at historical block, NOT current balance
6 require(blockNumber < block.number, "Block not yet mined");
7 return _checkpoints[account].getAtBlock(blockNumber);
8}
9
10// Governor uses this for vote weight calculation
11function _getVotes(
12 address account,
13 uint256 blockNumber,
14 bytes memory /*params*/
15) internal view override returns (uint256) {
16 return token.getPastVotes(account, blockNumber);
17 // Flash loan tokens acquired at block N+10
18 // return vote weight of ZERO
19}
If an attacker injects flash liquidity at block N+10N+10, the voting system ignores it, returning a vote weight of zero. Furthermore, implementations like GovernorVotesSuperQuorumFraction enforce absolute total-supply percentage thresholds for critical budgetary movements. Off-chain voting via Snapshot.org applies this exact block-indexing logic to eliminate gas friction while retaining atomic immunity.

Real-time algorithmic verification

Advanced auditing frameworks employ real-time execution analysis. Systems utilize "Cash Flow Trees" and dynamic simulation environments to track underlying state mutations. When addressing oracle manipulation, simulated forensic models (such as those tested on Warp Finance) prove that adopting a Fair Reserve Model — which dynamically limits parametric variance windows — vastly outperforms the rigid mathematical approximations of traditional Time-Weighted Average Prices (TWAP), preventing millions in immediate erosion.
For a structured approach to auditing complex multi-contract governance systems, our Divide and Conquer methodology provides a proven framework. Complement this with fuzz testing and formal verification to validate governance invariants under adversarial conditions.

Governance security checklist

  • Enforce timelocks (minimum 48 hours) on all executable proposals
  • Implement N-1 block checkpointing via ERC20Votes for vote weight calculation
  • Set quorum thresholds relative to total supply, not circulating supply
  • Cap maximum governance power any single address can accumulate
  • Require multi-sig execution for treasury operations above threshold
  • Monitor for flash loan-sized token movements in governance contracts
  • Validate proposal bytecode against deployed contract bytecode before execution
  • Separate proposal creation rights from execution rights
Governance defense architecture

Next-generation governance: optimistic dual structures

The systemic exhaustion of pure token-weighted voting has accelerated the adoption of Optimistic Dual Governance. Implemented by Lido and Aragon OSx, this architecture strictly separates proactive legislative generation from reactive, multi-layered veto protection.

Bicameral separation of powers

The Optimism Collective enforces a rigid bicameral segregation. The Token House governs economic parameters via OP tokens, while the Citizens' House governs public goods funding through RetroPGF. The Citizens' House relies strictly on non-transferable Soulbound NFTs (via AttestationStation), guaranteeing an unforgeable "one entity, one vote" ecosystem completely insulated from atomic capital.
This mirrors the separation of concerns principle in software security architecture — a single compromised layer cannot cascade into total system failure.

Lido's escapement mechanism and "rage quit"

Liquid staking protocols face a severe principal-agent dilemma: LDO token holders govern the smart contracts that custody the ETH belonging to stETH holders. To prevent LDO whales from passing malicious logic to expropriate the underlying ETH treasury, Lido engineered a defensive bulwark based on an Escrow contract and "Veto Signalling."
If LDO delegates pass a hostile proposal, stETH holders can deposit their synthetic assets into the Escrow contract:
  • 1% threshold (Veto signalling): If the Escrow balance reaches 1% of total stETH supply, it triggers an algorithmic suspension, pausing the execution of the LDO proposal via an elastic delay ranging from 5 to 45 days.
  • 10% threshold (Rage quit): If the malicious action persists and the Escrow contract accumulates 10% of the stETH supply, the system triggers a permanent "Rage Quit" state. All protocol state updates are frozen, and the system opens an unalterable, cryptographically guaranteed exit route, allowing minority stETH holders to physically extract their authentic ETH backing before the malicious LDO proposal can execute.
1Lido Optimistic Dual Governance state machine:
2
3 ┌──────────┐ LDO proposal ┌─────────────┐
4 │ Normal │ ────────────────► │ Proposal │
5 │ State │ │ Pending │
6 └──────────┘ └──────┬──────┘
7 │
8 stETH deposit to Escrow
9 │
10 ▼
11 ┌─────────────────┐
12 < 1% │ Escrow balance │ ≥ 1%
13 ┌───────────│ vs stETH │──────────┐
14 │ │ total supply │ │
15 ▼ └─────────────────┘ ▼
16 ┌──────────┐ ┌──────────────┐
17 │ Execute │ │ Veto │
18 │ Proposal │ │ Signalling │
19 └──────────┘ │ (5-45 day │
20 │ delay) │
21 └──────┬───────┘
22 │
23 Escrow reaches 10%
24 │
25 ▼
26 ┌──────────────┐
27 │ RAGE QUIT │
28 │ State frozen │
29 │ Exit route │
30 │ guaranteed │
31 └──────────────┘
This dual governance model ensures that even if governance tokens are captured — whether through flash loans, gradual accumulation, or market manipulation — the minority stakeholders whose capital is actually at risk retain a cryptographically guaranteed escape route.
Understanding why protocols need these sophisticated defenses requires context on how audited DeFi protocols retain more TVL — trust architecture directly impacts capital stickiness and protocol survival.

Conclusion

The evolution of DAO architectures is defined by a continuous arms race between mechanism designers and economic exploiters. The foundational assumption of early DAOs — that capital concentration inherently aligns with long-term protocol health — has been definitively dismantled by the rise of temporal algorithmic exploits and flash loan atomicity.
To secure future decentralized infrastructure, reliance on pure linear token voting must be abandoned. The implementation of N-1 block checkpointing, rigid timelocks, and Proof of Personhood frameworks is no longer optional. Ultimately, secure architectures must assume that the probability of a hostile takeover is statistically greater than zero. Thus, survival dictates implementing optimistic dual governance layers with immutable, cryptographically guaranteed escapement vectors, ensuring that minority participants are protected by the strict determinism of mathematical code rather than the fragile promises of decentralized democracy.
Whether you are building a new DAO, upgrading an existing governance system, or preparing for a smart contract audit, the defensive patterns outlined here are not optional — they are the minimum viable security architecture for any protocol managing significant treasury assets.

Get in touch

Governance security sits at the intersection of mechanism design, game theory, and smart contract engineering. A single misconfigured voting parameter or missing timelock can expose your entire treasury to atomic extraction.
At Zealynx, we specialize in smart contract security audits with deep expertise in governance architecture, flash loan defense, and defense-in-depth workflows. Whether you are launching a new DAO, upgrading your governance contracts, or validating that your existing timelocks and checkpointing are correctly implemented, we help you identify the architectural flaws before attackers do.

FAQ: DAO governance security

1. What is a DAO, and how does its governance work?
A Decentralized Autonomous Organization (DAO) is a blockchain-based entity where decision-making is executed through smart contracts rather than centralized management. Members typically hold governance tokens that grant voting power proportional to their holdings — a model called token-weighted voting. Proposals for protocol changes (parameter adjustments, treasury allocations, contract upgrades) are submitted on-chain, and token holders vote to approve or reject them. If a proposal meets the required quorum and approval threshold, it is executed automatically by the smart contract. This eliminates human intermediaries but creates new attack surfaces when the voting mechanism itself can be manipulated.
2. How can a flash loan be used to attack DAO governance?
Flash loans allow anyone to borrow unlimited capital with zero collateral, provided it is repaid within a single transaction. In governance attacks, an adversary borrows millions in governance tokens, uses them to vote on or execute a malicious proposal (such as draining the treasury), and repays the loan — all atomically within one block. The attacker needs no initial capital and risks nothing but gas fees if the attack fails, since the transaction simply reverts. This was the exact mechanism behind the $182 million Beanstalk exploit in 2022. The primary defense is temporal separation: timelocks that force a delay between proposal approval and execution, and N-1 block checkpointing that only counts vote weight from the block before the vote, making flash-loaned tokens invisible to the governance system.
3. What is quorum in DAO governance, and why does it matter for security?
Quorum is the minimum percentage of total voting power that must participate in a vote for the result to be valid. It exists to prevent proposals from passing with tiny minority support when most token holders are disengaged. However, setting quorum too low allows attackers to pass proposals when participation is predictably low (weekends, holidays). Setting it too high can create governance deadlock. Security-critical quorum design should be calculated against total token supply (not circulating supply), apply higher thresholds for treasury movements, and account for historical participation rates to find the balance between security and operational continuity.
4. What is the CREATE2 opcode, and how was it exploited in the Tornado Cash attack?
CREATE2 is an EVM opcode that deploys contracts to deterministic addresses calculated from the deployer's address, a salt, and the contract's bytecode hash. Unlike the standard CREATE opcode (where address depends on nonce), CREATE2 allows deploying a contract, destroying it with selfdestruct, and then deploying a completely different contract to the same address. In the Tornado Cash exploit, the attacker submitted a "benign" contract for governance approval, self-destructed it after the vote passed, then deployed a malicious contract to the identical address. When the DAO's timelock executed a delegatecall to the approved address, it unknowingly ran the hostile payload, minting 1.2 million fake votes and capturing the protocol.
5. What is a Sybil attack, and how does it undermine quadratic voting?
A Sybil attack occurs when a single entity creates multiple fake identities to gain disproportionate influence in a system. In the context of quadratic voting — where the cost of votes scales as Cost=Votes2Cost = Votes^2 — the attack is particularly effective. Instead of spending 100 tokens for 10 votes from a single address, an attacker splits 100 tokens across 100 addresses, getting 1 vote per address (cost: 1 token each) for a total of 100 votes. This completely bypasses the quadratic penalty and reverts the system to linear dynamics. Defenses include Proof of Personhood verification (e.g., Gitcoin Passport), graph analysis to detect coordinated wallet clusters, and hybrid models combining on-chain identity with off-chain attestations.
6. What is optimistic dual governance, and how does it protect minority stakeholders?
Optimistic dual governance separates proactive proposal creation from reactive veto protection, creating a bicameral system where different stakeholder groups check each other's power. In Lido's implementation, LDO token holders can pass governance proposals, but stETH holders (whose ETH is actually at risk) can deposit into an Escrow contract to signal opposition. If 1% of stETH supply enters escrow, the proposal is delayed 5-45 days. If 10% enters escrow, a permanent "Rage Quit" is triggered — the protocol freezes and opens a guaranteed exit route for minority stakeholders to withdraw their ETH before any malicious proposal executes. This ensures that even if governance tokens are captured through accumulation or market manipulation, the users whose capital is at stake retain a cryptographic exit guarantee.

Glossary

TermDefinition
DAOA blockchain-based organization governed by smart contracts and token-weighted voting rather than centralized management.
Flash loanUncollateralized loan borrowed and repaid within a single atomic transaction, often used for arbitrage or governance attacks.
Governance attackAn exploit that weaponizes a protocol's legitimate voting mechanics to pass malicious proposals or drain treasury funds.
QuorumThe minimum percentage of total voting power that must participate for a governance vote to be valid.
TimelockA smart contract mechanism enforcing a mandatory delay between proposal approval and execution, blocking atomic attacks.
Sybil attackAn attack where one entity creates multiple fake identities to gain disproportionate influence in decentralized systems.
Quadratic votingA voting system where the cost scales geometrically (Cost=Votes2Cost = Votes^2), reducing whale dominance but vulnerable to Sybil attacks.
Rage quitA governance escape mechanism allowing minority stakeholders to withdraw their assets before a hostile proposal executes.
Soulbound tokenA non-transferable NFT used for identity verification in governance, preventing token-based vote buying.

Working auditors in your corner, all year

Zealynx Insiders: weekly live sessions, 1:1 advisory, pair-auditing, and Krait runs on your code, from an audit firm that publishes its reports.

M3D
Written by

Growth lead at Zealynx

Keep reading
Flash loan attacks: anatomy of nine-figure DeFi exploits
Attack vectorsApr 29

Flash loan attacks: anatomy of nine-figure DeFi exploits

37 min read
Your Vault Prices Collateral at $1: 5 Ways to Bad Debt
Attack vectorsNov 6

Your Vault Prices Collateral at $1: 5 Ways to Bad Debt

17 min read
Your Uniswap v4 Hook Is Public: 5 Ways It Gets Drained
Attack vectorsNov 9

Your Uniswap v4 Hook Is Public: 5 Ways It Gets Drained

20 min read